Sod and Green Roof Add Color to the Building.

  • Curb and gutter are now installed in the south parking lot area, circling where the paver will lay asphalt in the coming weeks.

  • Sod is now planted in the courtyard.

  • Metal panel work continues on the southeastern corner of the building and will push north.

  • Bathroom fixtures are onsite and will be going up once doors are installed.

  • The gym is now completely clear of materials, awaiting the gym floor manufacturer's delivery.

  • Our drywall contractor continues to finish drywall on the third floor moving down, allowing the painter to follow.

  • The painter is pushing through the third floor, going from the top to the bottom of the building, allowing for the installation of our drop ceilings.

  • The electrician, plumber, and HVAC specialists continue to work on finishes.

  • The kitchen equipment is now installed and awaiting connection, as well as the equipment in the concession stand by the gym.

  • The floor contractor has delivered their flooring and will begin install this month. 

  • The green roof has been planted on half of the roof and will be completely installed by the end of November.

Previous
Previous

With Exterior Doors In Place, Heating Allows For More Interior Work

Next
Next

Site Work Ramps Up as Roofer Prepares to Place the Green Roof